在线成 人国 产,一级婬片试看60秒,精品无码秘 人妻一区二蜜桃,人人妻人人澡人人爽,免费看的强伦轩一级A片在线观看

Stainless steel pipe making machine stainless steel pipe welding machine

Productrealmap:Productdetails1.StainlesssteeldecorativepipecontrolmachineThestainlesssteeldecorativepipemachineismainlyusedfortheproductionofstainlesssteelpipesandcarbonsteelpipesfordecoration,product

Product real map:


1869497355_753290084.jpg


Product details

1. Stainless steel decorative pipe control machine

The stainless steel decorative pipe machine is mainly used for the production of stainless steel pipes and carbon steel pipes for decoration, products, household appliances, etc. The products produced by this series of moulds are round, square and rectangular pipes, as well as elliptical, semi-circular and plum-blossom pipes. Such as: stainless steel staircase handrails, burglar proof doors and windows, electric heating pipes, housing leakage pipes, etc.


2, automated production process:

Through the continuous forming process of uncoiling, feeding guidance, marking, forming, welding, external weld grinding, shaping and sizing, sizing, cutting (coil), jointing, etc., the structure is fine and the operation is simple.


3. Product characteristics: the machine is strong, durable, high precision, fully automated, simple to operate, continuous production, high efficiency, less waste of materials, high yield, low production cost.


4, technical parameters:

Model

(mm)

(mm)

(mm) 

(mm) 

Power

L*W(m) 

Basic specification for pipe making machine

met-30

 30

 20

Φ5-Φ25

 0.25-0.8

 5.5KW

 19.5*1.0m

met-S40

 40

 25

Φ6-Φ40

 0.25-1.2

 5.5KW

 20*1.0m

met-40

 40

 25

Φ9.5-Φ50.8

 0.25-2.0

 7.5KW

 21.5*1.1m

met-40L

 40

 25

Φ12.7-Φ63.5

 0.25-2.0

 11KW

 21.5*1.1m

met-50 

 50

 30

Φ25.4-Φ76.2

 0.4-2.5

 15KW

 24*1.2m

met-60

 60

 40

Φ50.8-Φ114

 0.7-3.0

 18.5KW

 26*1.4m

met-80

 80

 50

Φ76-Φ168

 1.0-4.0

 36.5KW

 32*2.3m

met-100

 100

 70

Φ114-Φ219

 1.5-4.5

 45KW

 36*2.5m

Operational considerations:

1, ensure smooth production and meet product requirements.

1.2 effective maintenance of equipment.

1.3, write reasonable operation instruction procedures to ensure the production plan and product quality achieve the desired goals.

2, scope of use:

Workshop management department.

3, rules:

3.1 ensure the effective cleaning of equipment and record of cleanliness during shift.

3.2 accurately control the operation of the machine before shift and coordinate with normal production. Pay attention to the opening of water, gas or electricity, grinding the wheel, saw blade and cutting table.

4, boot:

4 before starting, according to the lubrication requirements, injecting different lubricants to the parts where the lubricating oil is required to be injected.

4.1 first check whether the electrical switches are in the 0 position, then turn on the power supply.

4.2 Check whether the mechanical parts and pneumatic system are normal or not. If there are abnormal phenomena, they should be checked and eliminated in time so as not to cause mechanical equipment accidents.

4.3 Check the transmission gear is correct, otherwise there will be quality problems, whether the pressure gauge of the cutting machine reaches 0.5-0.7 mpa, otherwise it can not be cut.

4.4 Let the motor run empty for 2-3 minutes before going to work every morning. The transmission gears are equal to 0. When driving, the operator is not allowed to leave the machine tool and do other irrelevant things.

4.5 it is strictly prohibited to wear gloves to boot, long sleeved clothes must wear hand sleeves, and long hair must wear a hat.

4.6 do not wipe the rotating parts when starting.

4.7 correctly adjust the mold, not vigorously under pressure, in place.

4.8 during the operation, you are not allowed to leave the machine tool. You are not allowed to do other irrelevant things, and pay attention to whether the welds are normal.

4.9 In the process of pipe-making, the cutting strip must be consented by the workshop director, stored in the belt-laying area, and recorded in detail with the sling operator on the Production Process Card. It must not be discarded at will.

4.10 If abnormal phenomena are found in operation, such as smoke, burning odor, sudden fuse burning, sudden extinguishment of indicator lights and timely switching off the power switch to be checked out, then turn on operation after troubleshooting.

4.11 the product's length is checked regularly, not more than 6.01 meters, not less than 6 meters. Strictly controlled between 4mm. The pipe on the unloading pipe rack should not exceed 95% of the total capacity, so that the flat mouth personnel should be lifted in time, otherwise the operator will be responsible for the damage.

5, downtime:

5.1 stop welding while closing the power supply.

3

4

5

6


91丰艺裸体歌舞在线观看 | 字母数字黄片免费观看 | 免费污视频在线观看 | 蜜桃丰满熟妇av无码区不卡 | 四川丰满少妇一级A片 | 国产睡熟迷奷系列91爆料 | 青青草原在线视频免费观看 | 黄色网址成人在线观看 | 色欲人妻AAAAADIY101| 久久久无码喷水日本动漫一区二区 | 白浆高潮一区二区三区九色 | 国产农村妇女毛肩精品Av | _97夜夜澡人人爽人人 | 海角亂倫精品一区二区 | 黄色成人网站在线观看 | 亚洲 激情 图片 小说 伦 | A级毛片试看120分钟 | 国产 成年妇 视频下载 | BBW搡BBB搡BBB二区 | 四虎成人永久免费视频 | 欧洲在线看片网址 | 国产做受免费无码A片国语 亚洲第一精品人人澡人人爽 | 欧美丝袜AAAAA片 | 仙踪林免费网站入口www | 黄色视频免费观看无码 | 国产高潮流白浆喷水视频 | 日韩无码一区二区不卡 | 3区4区黄色视频在线播放 | 国产人妻无码一区二区三区不卡 | 成人影片在线免费观看 | 1000部丰满熟女视频 | 荷兰性群交视频二区三区 | 亚洲黄色视频XXXX | 国产一级二级三级电影 | 国产黄色视频黄色视频 | 国产探花在线精品一区二区 | 精品国产丝袜自拍人妻 | 亚洲欧洲国产一区二区三区 | 精品久久BBBBB精品人妻 | 国产午夜影院福利区 | 岳乱一区二区三区四区 |